PMU 132/33kV GIS Substation (90MVA x 2), Melaka

Establishment of a 132/33kV gas-insulated main intake substation (PMU GIS), 90MVA x 2, in Melaka.

PMU 275/132/33kV (Industrial Park), Pahang

Supply, erection and commissioning of a 275/132kV main intake substation (PMU) with two 132kV UGC bays for an industrial park in Pahang.

Utility-Scale Solar PV Plant, Kedah

Development of a 30 MWac / 45 MWdc utility-scale solar PV plant in Kedah.

Data Centre CLS 132/33kV (120MVA x 2), Selangor

132kV consumer landing station for a hyperscale data centre in Selangor.

Tolled Expressway Solar PV

EPCC and maintenance of a 1,373.68 kWp commercial solar PV system for a tolled expressway.

National Utility Fleet (Off-Grid)

Full EPCC scope of a 98.28 kWp commercial solar PV system with battery energy storage (BESS) and a 60kW EV DC fast charger for the fleet management division of a national utility.

Energy Audit for 5-Star Hotel

Detailed energy audit under EACG 2.0 for a 5-star hotel in Selangor.

Energy Audit for Logistics Provider

Detailed energy audit under EACG 2.0 for a road transport and logistics provider.

Courier & Logistics Company EV Charging, Selangor

Installation, testing and commissioning of two 7kW EV chargers for an international courier and logistics company at an industrial area in Selangor.

Commercial Retail Development EV Charging, Johor

Installation of HDG cable trays and cable ladders, metal trunking, cabling, scaffolding and sleeper works for a 300kW EV DC charger at a commercial retail development in Johor.

Shopping Mall EV Charging, Kuala Lumpur

Supply, installation, testing and commissioning of two 7kW EV chargers for a suburban shopping mall in Kuala Lumpur.

Semiconductor Manufacturing Facility, Pulau Pinang

Full EPCC scope with PV modules and inverters of a 1,859.68 kWp commercial solar PV system at a semiconductor manufacturing facility in Pulau Pinang.

Manufacturing Plant BESS, Selangor

Full EPCC scope of a 200kW/430kWh all-in-one 3-phase BESS for peak shaving and maximum demand management at a manufacturing plant in Selangor.

Energy Audit for Electronics Manufacturer

Detailed energy audit under EACG 2.0 for an electronics manufacturer.

Municipal Authority Solar PV, Kuala Lumpur

EPCC and maintenance of a 1,065.74 kWp commercial solar PV system for a city municipal authority in Kuala Lumpur across two public facility sites.